Notes

Pre-deployment checklist

Published on

Before every deployment I mentally run through the same points. The goal is not to bring the kitchen sink, but to avoid arriving on site missing the one part that makes everything work.

  • Technical docs: plans, schematics, IPs, credentials, on-site contacts.
  • Critical hardware: spare cables, adapters, power supplies, LED modules or display spares.
  • Tools: screwdrivers, tester, multimeter, cable-tie bags.
  • Access: badges, opening hours, security contact, parking.
  • Comms: charged phone, plan OK, roaming enabled if international.

The aim: arrive, install, test, sign off, leave. No heroics, just good order.

← Back to notes