LED wall commissioning checklist

Published on

Handing over an LED wall is the moment when small oversights become big problems. Here is the checklist I run through before sign-off:

  • Power and signal cabling: redundant routes, strain relief, easy access.
  • Module calibration: brightness, colour temperature, dead pixels, uniformity across batches.
  • Control chain: sender card, receiver cards, NovaStar software version, backup config saved.
  • Content testing: resolution match, aspect ratio, safe zones for fixed elements.
  • Emergency procedures: who to call, how to reboot, where the spare modules are.

A signed checklist takes ten minutes and saves hours of panic later. Clients remember the handover more than the installation.